Example configurations

Line configuration with synchronous fixtures

Main workflow per line, cycles idling and load test sequentially.

What it is about
Station: Sync Test-Station Simulation Category: Line & station configurations

Two test lines with two fixtures each operate in a common cycle: the main workflow of each line calls the idling test and the load test one after the other in a loop. In every test step the product variant is selected through the product chooser, current and voltage signals (ammeter, voltmeter) are measured through a simulated analog I/O and the results are stored. Two product variants demonstrate product-related result storage.

The sequence in detail

Workflows in detail

  1. Main 1 / Main 2

    Main workflow per line, cycles idling and load test sequentially.

    Start → loop (wait time → call IdlingTest → call LoadTest) → end; error flow present.

  2. IdlingTest (lines 1 and 2)

    Idling test: one measurement run with product selection, current and voltage measurement, storage.

    Start → product chooser → ammeter measurement → voltmeter measurement → store → end.

  3. LoadTest (lines 1 and 2)

    Load test with an identical structure.

    Start → product chooser → ammeter measurement → voltmeter measurement → store → end.

Take it with you

Import through the SonicTC DbManager — individually or merged into an existing database.

← All example configurations

Ready to experience acoustic test technology in your line?

Send us your part or schedule an online demo. First assessment within 24 hours.

Or call directly: +49 721 94650-0
Call Request feasibility